PRED - Park Ridge Electric Department

New Jersey Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

A customer’s wind or solar photovoltaic systemcannot exceed 90% of the customer’s current peak electric needs of theirresidence or facility, as applicable  

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

PE Stamped  

Electric Service Reqs

Refer to Interconnection Policy

Install Reqs

- The manual disconnect switch will be opened and the inverter will be observed going offline 

- Separate driven ground bonded to the main service panel ground connection with a reading of 25 ohms or less. If applicable, all neutrals of the PV system bonded to the main service panel neutral connection.

Placards

- Manual disconnect switch near revenue meter or permanent mounted sign at revenuemeter indicating accessible location of manual disconnect switch  

- Permanent mounted sign with 3 inch letters, and in a format of the labels attached stating“DISCONNECT” at the manual disconnect switch location.  

Website
link
Phone
(201) 391-2113

Other details

Restrict Inspection
0
Address ID
135742
Express Planset Eligible
Yes