Xcel Energy (NM)
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Tap Criteria
INV - KNIFE BLADE AC - PM - FUSED AC - POI
MUST HAVE 18IN INSIDE PANEL
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
120% of 12 month usage
If usage provided below 4 months use this document --------> NEW HOME SIZING
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
PM AND DISCO MUST BE WITHIN 10' OF UM
- SLD Reqs
USE XCEL ENERGY SPECIFIC BLOCK IN CAD
USE CHECKLIST FOR ALL PROJECTS ------->CHECKLIST
EXAMPLE PROJECT ------> EXAMPLE
Inverter
- IF SOLAREDGE INVERTER, remove "RGM" from the Inverter callout.
- indicate TPW 3 model number "1707000-XX-Y"
SLD
- Minimum #6 wire required from Inverter to POI
- Leader with verbiage "Reference Point of Applicability" pointing at GATEWAY, INVERTER, OR COMBINER FOR ENPHASE
- MUST WRITE 1PH, 3-W, 240V ON ALL EQUIPMENT from inverter to POI
- Make sure all overhead service have proper clearance. if not proper clearance, then send to ER for resolution
- Electric Service Reqs
Utility Meter should be 200A with bypass
- If meter is less than 200A, NEW METER CAN NEEDED
- IF NEW METER CAN IS NEEDED, CHECK TO SEE IF MSP/MBE IS OUTSIDE. IF NOT, NEW MBE IS REQUIRED.
- Install Reqs
- Placards

- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Site Plan Notes
All Jobs [24/7 UNESCORTED KEYLESS ACCESS SHALL BE PROVIDED TO ALL XCEL ENERGY EQUIPMENT // THE UTILITY AC DISCONNECT IS VISIBLE-OPEN TPYE, LOCKABLE, AND READILY ACCESSIBLE // NO SERVICE CLEARANCE ISSUES // PRODUCTION METER AND AC DISCONNECT WILL BE LOCATED WITHIN 10' OF MAIN SERVICE METER]
- Electrical Diagram Notes
All Jobs [24/7 UNESCORTED KEYLESS ACCESS SHALL BE PROVIDED TO ALL XCEL ENERGY EQUIPMENT THE UTILITY AC DISCONNECT IS VISIBLE-OPEN TYPE, LOCKABLE, AND READILY ACCESSIBLE. NO SERVICE CLEARANCE ISSUES. PRODUCTION METER AND AC DISCONNECT WILL BE LOCATED WITHIN 10' OF MAIN SERVICE METER. PRODUCTION METER SHALL BE RINGLESS TYPE WITH LOCKING JAW. THE METER SOCKET FOR THE PV PRODUCTION METER SHALL BE MARKED WITH A STAMPED BRASS, ALUMINUM, OR STAINLESS STEEL TAG, INDICATING THE ADDRESS INCLUDING THE UNIT, TYPICALLY "PV PROD" IN ACCORDANCE WITH THE REQUIREMENTS FOR "METER IDENTIFICATION" IN SECTION 4.14.4 OF THE BLUE BOOK. THE METER SHALL BE SPECIFIED AS 1-PHASE, 3-WIRE. THE PV PRODUCTION METERING WILL BE IN COMPLIANCE WITH THE MOST RECENT REVISION OF THE XCEL ENERGY STANDARD FOR ELECTRIC INSTALLATION AND USE BLUE BOOK. INVERTER IS UL1741, UL1741 SA, AND UL1741 SB COMPLIANT]
- Website
- link
- Phone
- (303) 571-7652
Other details
- Restrict Inspection
- 0
- Address ID
- 146755
- Express Planset Eligible
- No