Mt. Wheeler Power
Net metering & export
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
No specific requirements from utility to have on the Site Plan
- SLD Reqs
Meter Socket is required for each of the PV Lines.
- Electric Service Reqs
**System Sizing**
Mt. Wheeler Power does not restrict the amount of System Production the system provides. But for Net Metering customers, they are only crediting the customer's account up to 120%
"Net Metering Program shall be available to Cooperative’s Customers until the combination of all Customer-owned generating systems exceed 120 kW (0.1% of peak system Demand) or until Cooperative limits interconnections to a prescribed amount of kW in excess of 120 kW. "
**AC Disconnect:**
* Must provide a Disconnect Switch (Visible Open Disconnect Switch) that meets applicable ANSI, IEEE, UL and local governmental and Cooperative standards.
* Disconnect must be accessible to Cooperative personnel at all times, and Cooperative personnel must be allowed to padlock it in the OPEN position at any time for any reason.
* Disconnect Switch must be located on the exterior of the building, preferably adjacent to the electrical service entrance equipment.
* Disconnect Switch must be permanently and visibly marked as "Generated Disconnect" in letters at least 2" high.
* If the Disconnect Switch is not adjacent to the electrical service entrance equipment, a permanent/weather resistant map shall be installed at the location detailing where the Disconnect Switch is located.
**Taps: **
* No Line Side Taps Required
* Load Side Taps Are Allowed
- Website
- link
- Phone
- (775) 289-8981
Other details
- Restrict Inspection
- 0
- Address ID
- 108111
- Express Planset Eligible
- Yes