Buckeye Rural Electric Cooperative

Ohio Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

There will be two meters at the customer’s service location, one additive and one subtractive. The bill shall be calculated using the net amount used. If the amount of kWh on the subtractive meter exceeds the additive meter, the amount of kWh sold to BREC shall be compensated as a credit limited to the Generation & Transmission component of the bill.

The Consumer shall use the output of the Electric Generating Facility first to meet the requirements of Consumer’s electric consuming facilities located on the Premises. Any output of the Electric Generating Facility in excess of the requirements of Consumer’s electric consuming facilities shall be transferred to the Power Company and credited against the Consumer’s bill for electric service. Consumer shall only be entitled to receive a billing credit ($) for any such output of the Electric Generating Facility in excess of the requirements of the Consumer’s facilities, and in no event shall the Consumer be entitled to receive any payment from the Power Company for any such excess output of the Electric Generating Facility.

Rebates Offered
0
Deregulated
1
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes


Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Process


Allowed Meter Adapter
ConnectDER

Plans & docs

SLD Reqs


Placards


Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(800) 231-2732

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
647965
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Buckeye Rural Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.