Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Hancock-Wood Electric Cooperative

Ohio Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Net Excess Generation Notes

Net Metering allows owners of on-site solar or wind system to spin their meters backwards, effectively "storing" excess energy on the grid. A common misconception is that the electricity generated by a solar or wind system needs to be stored in a battery. While this is possible, current technology does not make it very cost effective.

With Net Metering, a building receives power from both the cooperative and the Member's solar or wind system. When solar or wind generation exceeds the building's electricity requirement, the excess is "stored" on the grid, spinning your meter backwards. When your renewable energy is not generating enough electricity for the building requirements, your cooperative supplies the power needed.

Rebates Offered
1
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes
  • Within a calendar year, the solar system generation cannot exceed the customer's total annual energy requirement.
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • The disconnect switch should be located externally to the equipment package and must be accessible to and lockable by EDU personnel, within an acceptable distance of the meter as determined by the EDU, at either the primary voltage level, which may include load-break cutouts, switches, and elbows, or at the secondary voltage level, which may include a secondary breaker or switch.
SLD Reqs
  • The line diagram is required to show the protection and controls, disconnection devices, nameplate rating of each device, power factor rating, and transformer connections.
Electric Service Reqs
  • If the customer connects a backup generator directly to the customer’s wiring to serve any load on the customer’s site, he shall utilize a double-throw transfer switch in order to ensure that no power is fed back onto the Cooperative’s distribution system. This is a critical safety requirement. 
Placards
  • The switch must be clearly labeled as a DR disconnect switch.
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(800) 445-4840

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
1652815
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Hancock-Wood Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.