Mid-Ohio Energy Cooperative
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- No
- NEM Type
- N/A
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.07
- Solar Export Value Notes
- Export Rate changes monthly
- Net Excess Generation Notes
Any excess energy produced beyond the consumer's usage is instantly sold to Buckeye Power at their purchase rate, with the resulting dollar credit applied to the consumer's monthly electric bill. If credits exceed charges by the end of the billing year (May 31st), the consumer receives a check for the excess amount. (Instantaneous kWh netting)
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- Yes
- Offset Type
- Combination
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Inverter Oversize Restrictions
- No
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (419) 673-7289
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes