Net Metering AllowedYes
NEM TypeAnnual
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

The meter on the facility is changed to an electronic meter that records the power the member draws off the grid and the amount of power the member generates back on to the grid. The two readings are used to determine the billing.

The Cooperative bills the Member for the energy supplied by the Cooperative over and above the energy supplied by the Member. This process occurs during each billing period according to the Cooperative’s applicable retail rate schedule.

If/when the energy supplied by the Member exceeds the energy supplied by the Cooperative during a billing period, the monthly charge and/or minimum bill of the retail rate schedule shall be billed by the Cooperative. If the energy placed on to the grid is greater than the amount drawn from the grid, the excess energy shall be credited at an avoided cost rate

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

No more than 120% of the member's yearly usage. The system cannot be larger than 25kW.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Installation, at the Member’s expense, of a visible break disconnect switch is required. The switch must be lockable and located within three (3) feet from the Cooperative’s meter, and must be properly labeled as “Utility Disconnect Switch”.

Install Reqs

You are only required to install the meter socket as the meter will already installed, we just need to program it for net metering once the solar installation is complete.

Placards

The AC disconnect switch must be labeled "UTILITY DISCONNECT SWITCH".

Equipment Approvals
California Energy Commission
Website
link
Phone
(800) 255-6815

Other details

Revision Required
No
Mod Swap Requires Planset
Yes