Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Tri-County Rural Electric Cooperative (OH)

Ohio Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

A members solar system production offsets or eliminates purchasing power from Tricounty (currently $0.12/kWh).

CURRENTLY, if the solar system overproduces or exports onto our system, we issue a kWh credit on the monthly bill with excess kWh’s above the monthly bill banked and paid out at the end of the year based on our avoided costs (currently $0.057/kWh)

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Phone
(419) 256-7900

Other details

Address ID
5148211
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Tri-County Rural Electric Cooperative (OH) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.