Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

CKEnergy Electric Coop

Oklahoma Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

When the energy supplied by the Member exceeds the energy supplied by the Cooperative during a billing period, the monthly charge and/or minimum bill of the retail rate schedule shall be billed by the Cooperative.

In addition, the Cooperative shall pay the Member on a monthly basis for the excess energy supplied by the Member to the Cooperative. The amount paid by the Cooperative to the Member shall be the Excess KWH Produced rate.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
300
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

System can be sized up to 300 kW

Preferred size for residential: Up to 25 kW AC or 100% offset whichever is less.

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

SLD Reqs

Relay Meter Orientation = Over/Under


PV meter wired top toward modules, bottom toward utility.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(405) 656-2322

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
6187545
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with CKEnergy Electric Coop before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.