NorthEast Oklahoma Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
At the end of the billing period, consumers are billed based on the sum of delivered and received power. If a member produces more energy than they consume, the kWh charge is zero and the bill will reflect the excess energy which shall be credited during the next billing period to the member at the monthly avoided energy cost ($0.024) per kilowatt-hour. If a member uses more than they produce, they are billed for the energy used along with the monthly service charge.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 125
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Facilities with installed capacity 125% or greater than the producer's peak load may be excluded from the "Optional Net Metering Arrangement"
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
NOEC does not allow any solar equipment to be installed in their meter boxes, poles or any NOEC equipment.
The interconnection has to be on the homeowner’s side with a visible Lockable Disconnect easily accessible to NOEC employees.
- Install Reqs
AC Disconnect Required
- Producer shall install, own, and maintain a disconnecting device at a location which shall at all times be visible and accessible to Cooperative personnel. The disconnecting device shall be installed at a mutually agreed to location between Producer and Cooperative. The disconnecting device shall have lockout capability.
Inverter must be UL 1741 listed
- Electrical Stamp Required
- 1
- Equipment Approvals
- California Energy Commission
Other details
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Express Planset Eligible
- Yes