Blachly-Lane Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
"(1) Each monthly billing period, BLEC will charge a member-generator the monthly facilities charge and all applicable charges for the net electricity that BLEC delivered. If in a monthly billing period a member-generator has supplied to BLEC more electricity than BLEC has delivered to the member-generator, BLEC will apply the excess kilowatt-hours as a cumulative credit to the member-generator’s monthly bill. BLEC will apply such credit at the avoided cost rate for each component on the bill that uses kilowatt-hours as the billing determinant.
(2) Unless otherwise agreed by BLEC and the member-generator, the billing cycle is the difference in the meter reading dates.
(3) BLEC will value any unused kilowatt-hour credit accumulated by a member-generator at the conclusion of the billing cycle at BLEC’s avoided cost as annually determined by the BLEC Board of Directors. After such valuation, BLEC will credit the member-generator the amount so determined at the close of the billing cycle. "
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
"The facility has a capacity of 25AC kilowatts or less. The cumulative generating capacity of all net
metering systems may not exceed 0.5 percent of BLEC’s single hour peak load. "
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
The disconnect switch must be readily accessible to BLEC at all times and located within 10 feet of BLEC’s meter.
- Install Reqs
"A member-generator must install and maintain a manual disconnect switch that will disconnect the net metering facility from BLEC’s electric distribution system. The disconnect
switch must be a lockable, load-break switch that plainly indicates whether it is in the open or
closed position. The disconnect switch must be readily accessible to BLEC at all times and
located within 10 feet of BLEC’s meter."
- Placards
State of Oregon Standards
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (541) 688-8711
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 284063
- Express Planset Eligible
- Yes