Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Net Excess Generation Notes

If the amount of electricity fed back to CU during the billing period by Customer exceeds the amount of electricity supplied by CU to Customer, then CU will bill Customer the minimum monthly charge(s) paid by other customers of CU in the same rate class as Customer and carry forward to the next billing period a credit for the excess kilowatt-hour generation fed back to CU. For the billing cycle ending in March of each year, any remaining unused kilowatt-hour credit accumulated during the previous year shall be granted to CU for distribution to CU customers enrolled in CU's low-income assistance programs.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes

Up to 25 kW AC

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(503) 266-1156

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
13209067
Express Planset Eligible
Yes