Milton-Freewater City Light & Power
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If a Customer-Generator feeds back to the City more electricity than the City supplies the Customer-Generator during a billing period, the City shall charge the Service Charge for that rate class but there will be no kWh charge for that month. The City will record the Customer-Generator’s excess kWh generated. Any excess kWh recorded will be rolled over to the following billing period. In March of each year, the prior 12 months of Customer-Generator’s kWh will be reviewed. If applicable, those who generated more kWh than the City provided to them - will be issued a payment equal to the excess kWh generated multiplied by the City’s Avoided Cost Rate. ($0.0350 / kWh)
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
25 kW AC max
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Rate Schedule Link
- link
- Website
- link
- Phone
- (541) 938-5531
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 6189945
- Express Planset Eligible
- Yes