Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
The AES/QF Owner is responsible for executing a contract with Allegheny to receive compensation for its output delivered into the Cooperative's electric system. At the end of each annual period, Allegheny shall compensate the AES/QF for kilowatt-hours generated by the AES/QF over the amount of kilowatt-hours billed by the Cooperative during the annual period at Allegheny’s avoided cost of wholesale power. The Cooperative may allow excess energy generated by an AES/QF to offset energy purchases at another location of the same member as long as the location is within two miles of the interconnection of the AES/QF.
- Rebates Offered
- 1
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 110
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- The system cannot generate no more than 110% of the member's annual electric energy consumption as determined during the 12 months immediately preceding the year of interconnection and may not have a nameplate capacity greater than 25kW for residential accounts.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- A lockable, manually operable, visible load-break disconnecting device is required for all AES/QF interconnections
- The device will be installed at an accessible location and must be labeled as required by the Cooperative to inform Cooperative personnel of the presence of generation
- SLD Reqs
- A lockable, manually operable, visible load-break disconnecting device is required for all AES/QF interconnections
- The device will be installed at an accessible location and must be labeled as required by the Cooperative to inform Cooperative personnel of the presence of generation
- Install Reqs
- Facilities shall be installed to current NFPA 70-2014 codes or latest edition or applicable electrical / building codes
- The Member shall not operate its project on an interconnected basis until the Member has received specific written permission from an authorized Cooperative employee and in such form as attached as Schedule C to the IPPA. Before such written permission, the Member may energize its project only for the sole purpose of witness testing. There are no exceptions to these energization and operation requirements.
- Electrical Stamp Required
- 1
- Website
- link
- Phone
- (800) 726-2324
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 190139
- Express Planset Eligible