Borough of Chambersburg
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
QREG customer net purchase of electricity: if, at the end of the billing month, the QREG customer has consumed more kilowatt-hours of electricity than the customer's QREG facility has produced, then all applicable charges of the appropriate rate schedule shall be applied to the net kilowatt-hours of Borough-supplied electricity the QREG customer has consumed.
QREG customer net sale of electricity: If at the end of the billing month, the QREG facility has produced more kilowatt-hours of electricity than the QREG customer has consumed, then the QREG customer will receive a credit for each net excess kilowatt-hour received by the Borough from the QREG customer at the QREG power rate. The QREG power rate will be determined by the Borough using one of the standard avoided cost methodologies and may be updated from time to time. The QREG customer is, in all cases, responsible for the customer charge and other charges in the applicable rate schedule.
- Rebates Offered
- 1
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 1
- Tap Criteria
- The point of common coupling shall be the point where the electrical conductors of the Borough’s System are connected to the customer’s conductors, typically at the weatherhead for overhead services or line side of the meter base for underground services.
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Generation Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
Plans & docs
- Site Plan Reqs
- AC disconnect must be accessible to the utility 24/7
- AC disconnect is located adjacent to the utility meter
- Generation meter required
- SLD Reqs
- Sample line diagram is available in the Database Files
- Generation meter required
- Electric Service Reqs
- The operating power required for the protection and control schemes for the QREG facility and the control power used to disconnect the QREG facility from the Borough must not be dependent on local Borough Electric System power, or must provide a “fail-safe” method to an “open” disconnected position upon loss of Borough supplied power.
- Install Reqs
- The QREG customer shall install (or cause to be installed) the Customer Owned Generation Disconnect Switch(s) in a location that is readily accessible by the Borough, emergency services personnel, and the QREG customer.
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (717) 261-3221
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 1458777
- Express Planset Eligible
- No