Borough of Kutztown (PA)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
We install a Bi-directional meter with two readings and credit back to the customer $.04061 a KWH for all received back from the customer on their monthly bill.
- Rebates Offered
- No
- Deregulated
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
AC Disconnect Required
- A visible open disconnect device shall be located on the electrical supply conductors between the solar inverter or service panel
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No