Citizen's Electric Company
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
With 'Net' metering, your electric meter tracks the total energy that is consumed from Citizens' Electric every month, as well as how much is exported back onto our system. At the end of the month, if you have exported more than you have used, you won't be billed for any kWh, and the extra energy will be added to a 'bank' that you can track on your bills. If, in a later month, you use more than you export, we'll apply kWh from your bank against your net usage for that month. You'll never lose a kWh that your system generates. The Energy Year ("EY") for Net Metering is the 12-month period from every June 1st through the following May 31st. On or after May 31, we check each net metering customer account to see if there is any remaining banked usage. If there is, we'll issue a check for the kWh in the bank based on our Price-to-Compare ("PTC") in effect when the energy was banked.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Express Planset Eligible
- Yes