PCLP - Pike County Light & Power Company

Pennsylvania Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The Company shall credit customer-generators who are EGS customers for each kilowatt-hour of electricity produced at the Company’s unbundled distribution kilowatt-hour rate. The distribution kilowatt-hour rate credit shall be applied monthly against kilowatt-hour distribution usage. If the customer-generator supplies more electricity to the electric distribution system than the Company delivers to the customer-generator in any billing period, the excess kilowatt hours shall be carried forward and credited against the customer-generator’s unbundled kilowatt-hour distribution usage in subsequent billing periods until the end of the year when all remaining unused kilowatt-hour distribution credits shall be zeroed-out. Distribution credits are not carried forward into the next year.

Rebates Offered
1
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Service is available upon request to renewable customer generators on a first come, first served basis so long as the total rated generating capacity installed by renewable customergenerator facilities does not adversely impact service to other Customers and does not compromise the protection scheme(s) employed on the Company’s electric distribution system and so long as the total rated generating capacity of the applicant customer, in combination with existing net metering customers, does not exceed 110% of the Company’s lowest base demand load capacity.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR) A service order must be created by customer service so a time can be scheduled for the line crew. We generally can accommodate the customers requested date, pending any outages or weather related delays

Allowed Meter Adapter
None

Plans & docs

Website
link

Other details

Restrict Inspection
0
Address ID
351190
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with PCLP - Pike County Light & Power Company before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.