St. Clair Borough Electric Light Department (PA)
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
- If the customer generates more energy than consumed during a monthly billing cycle, the customer shall receive an energy credit in kilowatt hours for the next billing month. Monthly credit shall be applicable to energy only. At the end of the 12 months, the Borough will purchase any excess generation at $0.0385/kWh
- If a member receives a total yearly credit of more than $600, they will receive a 1099, and will have to pay tax on it.
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Tap Criteria
Follow AHJ guidelines on tap allowances
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
Plans & docs
- Site Plan Reqs
Standard - Follow AHJ Requirements
- SLD Reqs
Standard - Follow AHJ Requirements
- Electric Service Reqs
AC Disconnect Required
- Shall be visual break
- Shall be accessible to the utility company
- Shall be capable of being locked in the open position
- Placards
Generation Site Warning Label:
- Must be posted in a conspicuous place on the electric meter or meter box to notify that there is a generator source installed on the load side of the meter
- Warning label shall not be placed in a location that would interfere with the ability to read the electric meter
- Must be placed before the generation is connected
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
Other details
- Express Planset Eligible
- Yes