Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Whenever the electricity generated by the Member’s distributed generation system exceeds the Member’s consumption, the Member shall be billed under residential tariff RS-8 for the Basic Facilities Charge for that billing period and credited for excess kWh generated during the billing period at Avoided Energy Cost, with this kWh credit appearing on the bill for the billing period.


Interconnection Agreement Option: (2023 - Monthly facility charges are subject to change)

Option 1: $19.00 - Standard Solar Metering

  • Energy rate for all metered energy - residential retail rate
  • No energy credits or saved (banked) excess solar energy

Option 2: $49.00 - Net Solar Metering

  • Energy rate for all metered energy - residential retail rate minus 2 cents
  • Excess energy produced by your solar panels can be saved (banked) and applied as a credit to future power bills
  • Energy credits are zeroed out each year in October

Option 3: $59.00 Primary Meter; $19.00 on other aggregate meter - Aggregate Net Solar Metering

  • Energy rate for all metered energy - residential retail rate minus 2 cents on primary meter
  • Other aggregate meters at standard rate
  • Excess energy produced by your solar panels can be saved (banked) and applied as a credit to future power bills
  • Energy credits are zeroed out each year in October
  • Solar energy may be applied to 1 or more member accounts regardless of where solar panels are located.
Rebates Offered
No
Deregulated
Yes
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Restrictions
20
System Size Restriction Type
DC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
No
System Offset Notes

20kw residential max

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Install Reqs

The installation of the Generator and all equipment in the system must comply with the latest published edition of IEEE 929 and IEEE 1547 as applicable. The Customer’s inverter or interconnection protection system must be tested and listed for compliance with the latest published edition of Underwriters Laboratories, Inc. (UL) 1741. Customer shall install a manual load-break disconnect switch with a clear visible

indication of switch position between Company’s electric system and Customer’s Generator."

Placards

Customer shall install a permanent warning label in a conspicuous place in closeproximity to the electric meter or on the meter base to notify Company personnel that there is agenerator installed on the load side of the meter. The warning label shall not be placed in alocation that would interfere with the ability of Company personnel to read the electric meter.Customer shall also place a warning label on the Isolation Device. Company will provide the warning labels to Customer. The warning labels must be in place before the Generator can beinterconnected with Company’s system.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(843) 538-5700

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes