Marlboro Electric Cooperative, Inc.
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Energy charges (or credits) shall be based on the rates in the applicable rate schedules as described in the Availability section above. For purposes of calculating monthly energy in kilowatt-hours, member’s usage shall be reduced by the total of (a) any excess energy delivered to the Cooperative in the current month plus (b) any accumulated excess energy balance remaining from prior months. Total energy in kilowatt-hours billed to members shall never be less than zero. For any billing month during which excess energy exceeds the member’s usage in total, producing a net credit, the respective energy charges for the month shall be zero. Credits shall not offset the facilities or distribution service charge for the applicable rate schedule.
Excess energy not used in the current billing month to reduce billed kilowatt-hour usage shall be accumulated and used to reduce usage in future months; however, any accumulated excess energy not used to reduce billed kilowatt-hour usage shall be reset to zero during the normal billing cycle each June. Excess energy delivered prior to June’s billing will only be used to reduce usage provided by the Cooperative prior to June’s billing.
There will be no compensation paid to the retail member for excess energy granted to the Cooperative.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- A manual load-break disconnect switch or safety switch with a clear visible indication of switch position between the Area EPS and the Distributed Resource. The switch must be visible to, and accessible to Company personnel. The switch must be in close proximity, and visible from, the Customer’s point of electrical interconnection with the Company’s Area EPS.
- SLD Reqs
- Required to be stamped by a licensed engineer
- Electrical Stamp Required
- 1
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (843) 665-4070
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 165119
- Express Planset Eligible
- Yes