Orangeburg DPU

South Carolina Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
1
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.07
Net Excess Generation Notes

Energy Charges shall be based on the applicable tariff Power Supply Charge plus applicable Distribution Charge applied to the kilowatt-hours purchased from the Department for the bill month. Energy Credits shall be based on the current Rate 2I Power Supply Fuel Charge applied to the kilowatt-hours delivered to the Department for the bill month. The net Energy Charge for any bill month shall be the Energy Charges for the bill month minus the Energy Credits for the bill month. For any bill month during which the net Energy Charges are a credit, the respective Energy Charges for the month shall be zero. Credits shall not offset the Service Charge or the Demand Charge.

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

DPU will require:

1. Overcurrent Protection and Ratings for the Utility Required AC System Disconnect Switch,

2. Rapid Shutdown Compliance with 2017 NEC.

3. All Equipment Engineering Data for PV Modules, Inverter (UL 1741), Batteries (if used), and Disconnect Fuses or Circuit Breakers.

4. Method of connection to utility.

5. Proper Labeling of Solar/PV equipment and UL Listing of Switches and other equipment.


IF the One-Line Diagram is not properly and adequately provided, DPU will not connect.


On the Site Plan, the utility required AC Disconnect switch shall be shown located in the immediate vicinity as the utility meter, and shall be readily accessible, meaning not installed inside a fenced area, or other place that utility employees can’t quickly access the disconnecting switch.


All conductors shall be adequately protected against short circuits and overcurrents per the NEC and a decent One-Line diagram will reflect all that. Please refer to SLD sample

Install Reqs

Utility Inspection Required: Yes

(Interconnection Requirements - Page 6, Section 5.2) A manual load-break disconnect switch or safety switch with a clear

visible indication of switch position between the EPS and the Generator. The switch must have pad lock provisions for locking in the open position. The switch must be visible to, and accessible to the Department personnel. The switch must be in close proximity, and visible from, the Customer’s point of electrical interconnection with the Department’s EPS. The switch must be labeled “Generator Disconnect Switch”. The

switch may isolate the Generator system and its associated load from the EPS or disconnect only the Generator from the EPS. After Install: Please do not close, or allow your electrician / installer to close, (place in the “on” position) the lockable disconnect switch until DPU has conducted its safety inspection of the installation.

Placards

The AC disconnect must be labeled “Generator Disconnect Switch”

Electrical Stamp Required
1
Equipment Approvals
California Energy Commission
Website
link
Phone
(803) 268-4204

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
157284
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Orangeburg DPU before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.