Winnsboro Electric Department

South Carolina Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
TOU Utility
No
Post Solar Billing Method
Net Metering
Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Placards
Warning Label: Customer will install and maintain a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify the Town personnel that there is a generator installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability of the Town personnel to read the electric meter. Customer shall also place a warning label on the Isolation Device. The Town will provide the warning labels to Customer. The warning labels must be in place before the Generator can be interconnected with the Town's system.
Website
link
Phone
(803) 635-4745
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Winnsboro Electric Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.