BEC - Bluebonnet Electric Cooperative, Inc.
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 50
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- Yes
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- If the client has 2 meters. we can install 1 system and request an aggregate of the production to both accounts.
- Inverter Oversize Restrictions
- No
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- Tesla Backup Switch
Plans & docs
- Site Plan Reqs
- Visible brake AC Disconnect within 10' from Utility Meter required
- No remote AC Disconnect is approved
- Equipment on Site plan needs to be clearly and legibly labeled, or have leaders
- All Batteries requires a separate ESS Disconnect per 706.15 NEC
- SLD Reqs
- NO PV Meter Required
- Electrical PE Stamped Required
- For projects with trenching, note on plans: The disconnect will be on a rack between 6-100 feet from the meter. (except for projects where the disconnect is adjacent to the meter)
- All Batteries requires a separate ESS Disconnect per 706.15 NEC
- For battery projects: this Utility is not accepting a supply side meter intercept without the gateway " meeting 120% rule". Utilize sum of breakers if possible to avoid corrections
- Electric Service Reqs
- 60% of Services will be located away from building on customer or utility-owned service pole.
- POI changes base on service: LST/Back-fed Breaker - min 6ft away from service pole and have a rack setup for AC Disconnect
- Electrical Stamp Required
- Yes
- Website
- link
- Phone
- (800) 842-7708