Centerpoint Energy

Texas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
NEM TypeN/A
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Value Notes
Centerpoint offers no credit for excess solar generation exported to the grid. Customers must sign up with a third-party supplier who offers a buyback credit.
Net Excess Generation Notes
  • For customers who utilize Centerpoint as their energy supplier, Centerpoint does not offer a solar buyback program (i,e. net metering or an export rate) and thereby does not give any credit for excess solar generation exported to the grid.
  • It is the customer's responsibility to sign up with a retail energy provider who offers a buyback program to maximize the value of their solar system, which they are strongly encouraged to do.
Rebates Offered
No
Deregulated
No
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Tap Criteria
  • Tap in the Utility Meter can is not allowed.
  • Taps require Fused AC Disconnect.
  • If generator is present: tap must be inside ATS enclosure above the main breaker.
  • Taps are allowed as long as a main breaker is present.


Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Required
No
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

All Jobs:

  • ESID REQUIRED ON ALL PROJECTS
  • METER NUMBER REQUIRED ON ALL PROJECTS
  • Show all systems, new and existing, on both Site and Roof Plans.
  • Utility Meter cannot be inside unless approved by Centerpoint Energy.
  • AC Disconnects need to be accessible to CNP linemen/personnel and emergency workers, 24/7
  • The address called out anywhere in the plans must reference the same zip code as the utility bill. This is regardless of how the zip code appears in any other place the address is listed.

Existing Systems:

  • Include model number of (E) inverter on site plan
  • Include quantity, make, and model number of (E) equipment on site plan.
SLD Reqs

All Jobs:

  • Main Breaker Enclosure must be labeled as Main Breaker Enclosure instead of MSP. (Centerpoint considers a Main Service Panel a load center that contains an internal panelboard with branch breakers feeding loads.)
  • Include Inverter comment on SLD: COMPLIES WITH PUCT RULE 25.212
  • Main Service Panel must include a Main Breaker. Hot Bus MSPs are not allowed.
  • Backfeed Breaker must be at end opposite Main Breaker.
  • For projects with Auto Transfer Switch, ELD must show Generator, ATS, MSP and UM.

Battery Projects:

  • If gutter box is used, show it on the ELD and provide pictures of its inside and outside.
  • Mode of Operation document required. See "UTILITY MODE OF OPERATION"
  • ESS and Solar both need (VLLD - Visible Lockable Labeled AC Disconnect) use generation disconnect or separate disconnects
  • Battery Model number must be labeled as well, Tesla Powerwall AC Powerwall 2012170-xx-y (this is a newer requirement from Oncor/CenterPoint)
  • TPW3 MODEL NUMBER 1707000-xx-y

Taps:

Houston Branch Preference

If exterior MBE exists, preferred POI hierarchy.

  1. Line Side Tap within Exterior MBE
  2. PV Breaker Tie In interior MSP
  3. Do not de-rate to 175A Main Breakers. Only available main breakers are 100A,125A, 150A, and 200A.

Existing Systems:

  • The existing module layout will need to show individual modules, not a single block.
Electric Service Reqs
  • FPE panels are an auto MPU.
Install Reqs

Required Photos:

  • Utility has strict requirements, see Pictures Requested.
Placards
  • If the AC Disconnect is out of line or sight or further than 10' from the CNP meter, a placard on/near the CNP meter must show the location of the AC Disconnect.
  • DER sticker is required on the meter can.
  • Placard map must include all fences and gates, locked or unlocked.
  • Label fence opening POINT OF ENTRANCE.
  • .
Electrical Stamp Required
No
Meter Num Req SLD 3LD
Yes
ESID Num Req SLD 3LD
Yes
Site Plan Notes

All Jobs [IF THE AC DISCONNECT IS FURTHER THAN TEN FEET AWAY, OR NOT IN LINE OF SIGHT FROM POINT OF INTERCONNECTION, A PLACARD WILL INDICATE ITS LOCATION.]

Electrical Diagram Notes

All Jobs [IF THE AC DISCONNECT IS FURTHER THAN TEN FEET AWAY, OR NOT IN LINE OF SIGHT FROM POINT OF INTERCONNECTION, A PLACARD WILL INDICATE ITS LOCATION]

Rate Schedule Link
link
Website
link
Phone
(713) 659-2111

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Centerpoint Energy before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.