Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Other
Solar Export Value Notes
Exported kWh @ $0.00
Net Excess Generation Notes

Energy will go to the customer's property first, any excess kWh generated (exported to the grid), will not be credited.


In no event, shall the City pay the Small Generator for electricity produced by the Small Generator. 

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 10 kW AC or DC

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

ESID Num Req SLD 3LD
0
Website
link
Phone
(512) 756-2402

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
2185919
Express Planset Eligible
Yes