City of Cuero - Electric Department
Net metering & export
- NEM Type
- Monthly
- Post Solar Billing Method
- Export Rate
- Net Excess Generation Notes
As provided for in the City of Cuero DG Rate Rider, the City of Cuero shall pay Customer for the “KWh Received” (energy received by the City of Cuero Distribution System) at the “Avoided Cost of Generation Rate” (ACGR). The ACGR is determined by the average per KWH cost of power supply for the preceding year for electric energy purchased by City of Cuero from its wholesale electric energy provider(s). The City of Cuero reserves the right to amend the ACGR at any time.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) Pay fee to utility dept, schedule disconnect, schedule inspection, and inspector contacts electrical dept to reconnect.
TDR - Who to
TDR - Applications/Documents Req
TDR - ETA of notice required for request
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
The location of the disconnect switch must be approved by the City of Cuero. The disconnect switch shall be easily visible, mounted separately from metering equipment, readily accessible to City personnel at all times, and capable of being locked in the open position with a City padlock. PV-INV-AC Disconnect-DG meter (optional)- MSP
No Production Meter Required
- Install Reqs
The customer shall provide and install a manual load break switch that provides clear indication of the switch position at the Point of Interconnection to provide separation between the City of Cuero’s electrical system and the customer's electrical generation system.
- Website
- link
Other details
- Restrict Inspection
- 0
- Address ID
- 622372
- Express Planset Eligible
- Yes