Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Giddings

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
0
Post Solar Billing Method
Non-export
Solar Export Type
N/A
Net Excess Generation Notes

No solar program, energy produced by the customer's solar will be consumed right away. Any exported kWh will not be compensated.

*** System must NOT negatively affect the utility side (doesn't trigger transformer upgrade)

*** Engineering study required for all application and will be invoiced separately from the Application Cost (fee varies per project)

Rebates Offered
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Phone
(979) 540-2710

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
7048351
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Giddings before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.