City of Lampasas

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.05
Solar Export Value Notes
Will change annually but can change anytime if the utility decides to.
Net Excess Generation Notes

Lampasas shall pay customer for "kWh received" at the "Avoided cost of generation rate"


The energy produced by the customer's DG system would go to the customer's house first, if it produced more than what they use at that given time, it'll be exported back to the grid. The "Received kWh" is the energy exported from the customer's DG system to the grid throughout the day. The credit (if there is) will show on the customer's bill under "Received kWh" multiplied by the current rate. In rare scenario, if the credit is higher than that month's bill, it'll carry over on the next billing cycle. The current rate will change as needed. However, this has not changed this year yet so it may go UP or DOWN.

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 20 kW AC . System over 20 kW AC is also available but will require additional engineering/interconnection review from the utility. Fees will need to be paid with no guarantee that it'll be approved.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Install Reqs


Website
link
Phone
(512) 556-8315

Other details

Restrict Inspection
0
Revision Required
1
Address ID
223166
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Lampasas before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.