City of San Marcos Electric Utility
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.06
- Solar Export Value Notes
- COSM will reimburse customers for energy “delivered to” the COSM distribution system at the avoided cost. Reimbursements will likely take the form of a credit on the customer’s monthly bill.
- Rebates Offered
- Yes
- Deregulated
- Yes
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- No
- System Offset Notes
The proposed generation system does not expect to export more than 15% of total load on the feeder
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Example SLD uploaded to files
- PV>Inverter>Disco>PM>MSP>UM
- Production Meter required between disconnect and POI. (Disconnect to bottom of PM, Utility to top)
- Electric Service Reqs
AC Disconnect Required
- Location of the disconnect switch must be approved by COSM.
- Disconnect switch shall be easily visible, mounted separately from metering equipment and readily accessible.
Production Meter Required
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (512) 393-8000
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes