City of Weatherford
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Percentage of Retail Rate
- Net Excess Generation Notes
For power produced in excess of on-site requirements, the Customer will be compensated by netting the Customer’s kWh generation against the Customer’s kWh consumption, referred to as “net metering.” The WMUS shall bill the Customer for the excess energy supplied by the WMUS over and above the energy supplied by the Customer during each billing period according to the WMUS’s applicable retail rate schedule.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Website
- link
Other details
- Restrict Inspection
- 0
- Address ID
- 773674
- Express Planset Eligible
- Yes