Comanche County Electric Cooperative Association
Net Metering Allowed0
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
CECA will reimburse members for energy “delivered to” CECA distribution system at the avoided cost of energy rate (ACER). The ACER is calculated based on the Cooperative’s wholesale electric energy provider’s monthly invoices. The Member’s compensation for the excess energy supplied to the Cooperative during the monthly billing period shall accumulate as a monetary credit to be applied to future energy purchases by Member.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 50
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 50 kW (as long as it doesn't trigger any upgrades)
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
- PV meter wired top toward inverter, bottom toward POI
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (800) 915-2533
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Address ID
- 121043
- Express Planset Eligible
- No