Concho Valley Electric Cooperative
Net metering & export
- NEM Type
- Monthly
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.055
- Net Excess Generation Notes
For power produced in excess of on-site requirements (out-flow), the Cooperative will purchase out-flow at Avoided Cost (as defined by the Tariff).
Avoided Cost is the Cooperative’s power supplier’s avoided cost as calculated and provided to the Cooperative by its power supplier for the applicable period. The Avoided Cost will be a 12-month running average cost of what CVEC pays to Golden Spread Electric Cooperative per kWh of electricity.
For DF Facilities that plan to operate in parallel, a DG output meter is required. The Member shall install a meter socket at the Member’s expense and to the Cooperative’s specifications for the DG output meter
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 110
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
DG Facilities greater than 15 kW DC will require an additional engineering study and the DG Facility size shall not exceed 110% of the previous two-year historic maximum demand for that location.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
The Cooperative may require additional information or may require the DG plan to be prepared by a Professional Engineer registered in the state of Texas.
PV Meter Socket and VLLD to be shown on layout
- SLD Reqs
Line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel. Meter Socket required, VLLD on layout
PV meter required, wired bottom toward inverter, top toward POI
The switch shall be located so as to be readily accessible to Cooperative personnel in a location acceptable to both the Member and Cooperative. Generally acceptable locations include: (1) the switch being located within 10 feet of the billing meter or (2) a placard located within 10 feet of the billing meter giving a description of the switch’s location.
- Electric Service Reqs
For DF Facilities that plan to operate in parallel, a DG output meter is required. The Member shall install a meter socket at the Member’s expense and to the Cooperative’s specifications for the DG output meter.
The meter socket shall be located so as to be readily accessible to Cooperative personnel in a location acceptable to both the Member and Cooperative. Generally acceptable locations include:
(1) the meter socket being located between the DG output or inverter(s) and the safety disconnect switch or
(2) between the safety disconnect switch and service panel for the residential or commercial load.
A Cooperative owned meter will be provided for the DG output meter socket upon successful inspection of the DG Facility.
- Install Reqs
A meter base must be installed on the output of the DG Facility. The DG meter base must be wired to have DG production flow from the bottom up through the meter.
- Placards
If the AC Disc is not within 10 feet of meter
A site directory placard indicating the location of the VLLD must be placed on the Member’s equipment beside the Cooperative’s billing meter. Signage shall be placed by the Cooperative at the Member’s expense and located at the disconnect indicating the purpose of the switch, along with contact names and numbers
of both the Member and the Cooperative.
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (325) 655-6957
Other details
- Restrict Inspection
- 0
- Address ID
- 121044
- Express Planset Eligible
- No