Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

CTEC - Central Texas Electric Cooperative Inc

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.03
Net Excess Generation Notes

Central Texas Electric Cooperative shall pay Member for the “kWh Received” (energy received by the Central Texas Electric Cooperative’s Distribution System) at the “Avoided Cost of Generation Rate” (ACGR). The ACGR is determined by the average per kWh cost of wholesale generation costs for electric energy purchased by CTEC from its wholesale electric energy provider(s). CTEC reserves the right to amend the ACGR at any time. The frequency and type of reimbursements and/or credits to Members will be determined by the Cooperative.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
50
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(800) 900-2832

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
121041
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with CTEC - Central Texas Electric Cooperative Inc before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.