Texas Utility Interconnection & net metering rules
Net Metering Allowed0
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.03
Net Excess Generation Notes

Purchases from a DG will be credited at the avoided wholesale energy cost of the cooperative's power supplier. of sales and purchases shall be accomplished by interconnection through two meters with one measuring all energy supplied by the Cooperative to the consumer and the

other measuring all energy supplied by the consumer, or a single meter capable of providing data so the Cooperative can determine the energy supplied by the Cooperative to the consumer and the energy supplied by the consumer to the Cooperative.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Tap Criteria

A Member may serve all load behind the meter at the location serving the Customer Generation facility

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Standard

Electric Service Reqs

Safety Disconnect:

  • Switch will be located to be readily accessible to the Cooperative personnel in a location acceptable to the member and cooperative.
  • The Switch shall be secured in an open position by a lock owned by the Cooperative.
  • Member may not bypass the disconnect switch at any time for any reason.

Taps:

  • Per utility, must meet all NEC requirements
Placards

Disconnect Placards Required

Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(936) 229-4000

Other details

Restrict Inspection
0
Address ID
108103
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with DETEC - Deep East Texas Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.