DETEC - Deep East Texas Electric Cooperative
Net Metering Allowed0
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Net Excess Generation Notes
Purchases from a DG will be credited at the avoided wholesale energy cost of the cooperative's power supplier. of sales and purchases shall be accomplished by interconnection through two meters with one measuring all energy supplied by the Cooperative to the consumer and the
other measuring all energy supplied by the consumer, or a single meter capable of providing data so the Cooperative can determine the energy supplied by the Cooperative to the consumer and the energy supplied by the consumer to the Cooperative.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Tap Criteria
A Member may serve all load behind the meter at the location serving the Customer Generation facility
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
Safety Disconnect:
- Switch will be located to be readily accessible to the Cooperative personnel in a location acceptable to the member and cooperative.
- The Switch shall be secured in an open position by a lock owned by the Cooperative.
- Member may not bypass the disconnect switch at any time for any reason.
Taps:
- Per utility, must meet all NEC requirements
- Placards
Disconnect Placards Required
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (936) 229-4000
Other details
- Restrict Inspection
- 0
- Address ID
- 108103
- Express Planset Eligible
- Yes