Report a correction Net Metering AllowedNo
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Solar Export Value Notes
- Avoided cost will change yearly.
- Net Excess Generation Notes
If your DRG system produces more energy than your home needs (instantaneously), the excess will flow back into Farmers EC grid (Out-flow). Farmers EC purchases all power sent to the grid (out-flow) at the current year’s Avoided Cost rate. Avoided Cost is a reflection of the wholesale cost of power.
- Rebates Offered
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Percentage
- Offset Value
- 110
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- The layout sketch is an overhead view of the physical layout between the Cooperative meter, the VLLD and the distance between the two. Required the words "Visible, Lockable, Labeled, Disconnect" written on the Sketch Required the VLLD located within ten feet of the cooperative meter. If not, Placard proof will be required to install at or near the Cooperative meter base showing the location of the VLLD.
- SLD Reqs
Meter Orientation = Under/Over
ALL JOBS
- The one-line diagram shows the sequence of the Cooperative meters, the VLLD and the generation equipment.
- Inverter -> AC Disconnect -> Production Meter -> POI (Solar goes to bottom of meter, top of meter to SES)
- The line/load (polarity) of the PV production meter must be shown on the electrical diagram.
TAPS
- Load Side Taps are not permitted
- Line Side Taps are allowed
- Install Reqs
DG output conductors wired to the bottom lugs of the meter base
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (903) 455-1715
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes