Fort Belknap Electric Cooperative Inc
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.049
- Net Excess Generation Notes
For energy produced in excess of instantaneous on-site requirements, the customer shall be compensated at the Coop's avoided cost. Avoided cost changes monthly (currently at $0.049 / kWh). The bill credit will roll over to the following month, after Dec 31 any remaining bill credit will reset to zero
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
- Website
- www.fortbelknapec.com
- Phone
- (940) 564-3526
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 0
- Address ID
- 121059
- Express Planset Eligible
- Yes