Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
Solar Export Type
Avoided Cost
Net Excess Generation Notes

CITY will purchase from Customer and Customer will sell exclusively to CITY the electrical output from the DG system that is “received” by the CITY Distribution System. Customer shall exclusively purchase from CITY its requirements of electric energy above the amounts generated by the DG system. Article 5.0 | Rate for Energy Received by the CITY The CITY shall pay Customer for the “KWh Received” (energy received by the CITY’S Distribution System) at the “Avoided Cost of Generation Rate” (ACGR). The ACGR is calculated based on the CITY’S power supply costs, which can be obtained from the CITY. The inputs to the calculation are derived from the CITY’S wholesale electric energy provider(s) monthly invoices. The CITY reserves the right to amend the ACGR at any time.

Rebates Offered
No
Deregulated
Yes
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A