Greenbelt Electric Cooperative, Inc.
Net metering & export
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.02
- Net Excess Generation Notes
The meter has two separate registers; a kwh delivered and a kwh recieved.
Customer will be credited for all recieved energy at avoided cost (.02 kwh) and billed for all energy delivered.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The only restriction is the current distribution transformer in the field. For example, if the member is currently fed by a 10kVA transformer the system may not be larger than 10 kW maximum capacity.
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
The diagram shall include at a minimum, all major electrical equipment that is pertinent to understanding the normal and contingency operations of the DG Interconnection Facilities, including generators, switches, circuit breakers, fuses, protective relays and instrument transformers.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (806) 447-2536
Other details
- Restrict Inspection
- 0
- Address ID
- 121065
- Express Planset Eligible
- Yes