Greenbelt Electric Cooperative, Inc.

Texas Utility Interconnection & net metering rules
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.02
Net Excess Generation Notes

The meter has two separate registers; a kwh delivered and a kwh recieved.

Customer will be credited for all recieved energy at avoided cost (.02 kwh) and billed for all energy delivered.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The only restriction is the current distribution transformer in the field. For example, if the member is currently fed by a 10kVA transformer the system may not be larger than 10 kW maximum capacity.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.

The diagram shall include at a minimum, all major electrical equipment that is pertinent to understanding the normal and contingency operations of the DG Interconnection Facilities, including generators, switches, circuit breakers, fuses, protective relays and instrument transformers.

Equipment Approvals
California Energy Commission
Website
link
Phone
(806) 447-2536

Other details

Restrict Inspection
0
Address ID
121065
Express Planset Eligible
Yes