Greenville Electric Utility System

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04
Solar Export Value Notes
Varies monthly
Net Excess Generation Notes

The monthly credit, if any, is calculated as follows: Each kWh delivered from the customer’s approved system to GEUS’ electric system is multiplied by the Fuel Adjustment Charge (FAC). The "kWh delivered" is defined as the energy (kWh) exported back to the grid when the customer produced more than what they consumed at that given time.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 25 kW AC system as long as the project does NOT trigger any transformer upgrade

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(903) 457-2800

Other details

Restrict Inspection
0
Revision Required
0
Address ID
1207615
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Greenville Electric Utility System before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.