Jasper-Newton Electric Cooperative, Inc.
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Total kWh will be netted at the end of the monthly billing period (kWh supplied by the utility - kWh generated/sent back to the grid from the customer's facility). Any excess kWh will be zeroed out and will not be credited or rollover.
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
NEM is only available for projects with 15 kW AC or less. Anything over 15 kW AC will be under Feed-In-Tariff
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- www.jnec.com
- Phone
- (409) 423-4076
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes