PEC - Pedernales Electric Cooperative Inc.
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Tap Criteria
- Taps required to be in a separate tap box/Hoffman tap box.
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Percentage
- Offset Value
- 110
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- No
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- SLD Reqs
Battery
- A single generation disconnect for both backup and isolated equipment
- The Transfer Switch needs to be between the Subpanel and the Main Panel with a placard shows the location of disconnect may have to be an auto transfer switch.
- AC Disconnect required to be 10' from utility meter unless utility meter is remotely located on a service pole or pedestal. In this situation, AC disconnect can be remotely located when utilizing PV breaker tie-in. If using LST tie-in, fused disconnect must be within 5' of utility meter on H-frame rack
- Electric Service Reqs
POI changes based on service:
- Back-fed Breaker
- Disconnect can be remotely located, no need to group, no rack required
- Install Reqs
- Grounding - Typ. PEC Service Meter is always Grounded add in sup. grounding was required
Scheduling a Temp Disconnect/Reconnect
- , need the address and meter number. They cannot promise a time of arrival but will take notes on what time we are requesting.
- if within city limits you will need a meter release inspection prior to reconnect.
- if needing to reconnect after 5pm you will need to call the PEC outage line
- Placards
- AC DISCONNECT OR PERMANENT PLACARD DIRECTORY MUST BE INSIGHT OF METER MUST BE TAGGED "ALTERNATE POWER SOURCE" POINT OF CONNECTIONS MUST COMPLY WITH ALL LAWS, REGULATIONS, AND STANDARDS
- Site Plan Placard required for a remote disconnect.
- Electrical Stamp Required
- No
- Equipment Approvals
- Other
- Equipment Approval Other
- N/A
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Site Plan Notes
All Jobs [SMTXU will have access to equipment at all times]
- Website
- link
- Phone
- (888) 554-4732