Pentex Energy
Net metering & export
- Net Metering Allowed
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0517
- Net Excess Generation Notes
No net metering shall be used. The type of metering to be used shall be specified at the solediscretion of the Cooperative. The metering shall provide data so the Cooperative can determine for each billing period the energy supplied to the Member by the Cooperative and the energy supplied to the Cooperative by the Member.
The Cooperative shall pay the Member on a monthly basis for the energy supplied by the Member to the Cooperative. The rate paid by the Cooperative shall be the Cooperative’s avoided cost.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Tap Criteria
- Line side taps are allowed but ONLY utilizing Polaris taps and ONLY in a main breaker enclosure or the main service panel
- NO vampire clips, B-Taps, or meter adapter lugs allowed
- We cannot tie into the utility meter can
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- Yes
- Meter Spot Process
- The customer MUST call the utility for the disconnect & reconnect. The utility would prefer a 3 day notice for a D&R, but will allow it to be called in the day before
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
The diagram shall include at a minimum, all major electrical equipment that is pertinent to understanding the normal and contingency operations of the DG Interconnection Facilities, including generators, switches, circuit breakers, fuses, protective relays and instrument transformers.
- Install Reqs
The Member shall install a visible load break disconnect switch at the Member’s expense and to the Cooperative’s specifications. b) The switch will be located so as to be readily accessible to Cooperative personnel in a location acceptable to both the Member and Cooperative.
- Placards
Signage shall be placed by the Cooperative at the Member’s expense and located at the disconnect indicating the purpose of the switch along with contact names and numbers of both the Member and the Cooperative.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (940) 759-2211
Other details
- Restrict Inspection
- 0
- Address ID
- 717873
- Express Planset Eligible
- No