Texas Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Net metering is allowed for systems up to 15 kW or less

Rebates Offered
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Placards

Requires “Engraved Placards” for anything Outside so modules, Disconnect, Inverter, etc. if they are outside they need to be Engraved Placards, NOT sticker Placards. Anything Inside, so Inside home or garage or inside the MSP can be Sticker Placards.

Rate Schedule Link
link
Website
link
Phone
(936) 327-5711

Other details

Restrict Inspection
0
Address ID
111754
Express Planset Eligible
Yes