South Plains Electric Cooperative, Inc.
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.081861
- Net Excess Generation Notes
Net-metering members are defined as members who have placed a type of distributed generation which is no greater than 50 kW behind the Cooperative’s meter. A member qualifying for this rate will receive credit in kWh generated against kWh consumed in one billing period. Kilowatt-hour credits will only offset up to the amount of kWh consumed in each billing period. All other applicable charges will be billed.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 50
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 50kW
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Plans Sample Attached
- SLD Reqs
line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
Visible, Lockable, Labeled AC Disconnect to be located within 10' of utility meter.
- Equipment Approvals
- California Energy Commission
- Website
- www.spec.coop
- Phone
- (806) 775-7732