UCS - United Cooperative Services
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Net metering for systems less than 50 kW
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
The equipment shall be behind the house and screened OR it can be wall-mounted next to the electric meter.
- SLD Reqs
Line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
For Enphase systems, show the envoy/monitoring device on plans.
UCS requires a single Firemans Emergency Disconnect between the UM and MSP/BUI/Gateway.
Example. Inverter>Gateway/BUI>MSP>Disco>UM
- Website
- link
- Phone
- (817) 447-9292
Other details
- Restrict Inspection
- 0
- Address ID
- 109327
- Express Planset Eligible
- Yes