Upshur Rural Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If permitted by the Cooperative’s power supplier, and at the Cooperative’s sole discretion, a Distributed Generation facility having a design capacity of 25 kW or less that is fueled by a renewable resource may be net metered by one of the following methods:
(1) Installing a single meter which runs forward and backward or
(2) Installing a single meter which has two registers, each measuring the flow of energy in a single direction and netting the energy consumption between the two registers to determine the net monthly flow of energy, or
(3) Installing two meters, each measuring the flow of energy in a single direction and netting the energy consumption between the two meters to determine the net monthly flow of energy
Net Metering is defined as measuring the difference between the electricity supplied by the Cooperative and the electricity generated by the Members facility and fed back to the electric grid over the operable time period.
Systems <25 kW : When the energy supplied by the Member exceeds the energy supplied by the Cooperative during a billing period, the monthly charge and/or minimum bill of the retail rate schedule shall be billed by the Cooperative in addition to the monthly metering charge, and the excess energy shall be provided at no charge to the Cooperative.
Systems > 25kW : If the Member’s generation is a QF, the Cooperative shall purchase power from the Member at the avoided wholesale energy cost of the Cooperative’s power supplier, or such other rate as mutually agreed upon by the QF-Member and the Cooperative and, if requested by the Cooperative, the Cooperative’s power supplier.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Most installations are under 25kW as the contract is less extensive.
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Disconnect be visible and within 10 feet of the meter.
Line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.
- Install Reqs
A Member may serve all load behind the meter at the location serving the Distributed Generation facility but will not be allowed to serve multiple meters, multiple consuming facilities or multiple Members with a single Distributed Generation facility or under a single Distributed Generation application.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (903) 843-2536
Other details
- Restrict Inspection
- 0
- Address ID
- 121227
- Express Planset Eligible
- Yes