Bountiful City Utilities
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- Annual
- TOU Utility
- 1
- Post Solar Billing Method
- Feed-in-Tariff
- Net Excess Generation Notes
As measured in KWH, the energy generated by the Feed-In Tariff Customer’s power generating equipment will be credited at the applicable time of day rates and then applied to reduce to the Customer’s monthly bill after the calculation of the Customer’s usage. Any Energy Credit in excess of the Customer’s Energy Charges will be used to offset other charges on that month’s bill. On April 1st of every year, BCLP will pay Feed-In Tariff Customers for any net credit owed to them by BCLP and the Customer’s credit balance will be returned to zero
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
For residential single-phase customers, the maximum allowable photovoltaic system size is 10 kW.
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
" Plan view (bird’s-eye) of site with placement of solar panels.
ï‚· A north arrow, the scale of the drawing, and the date of the drawing.
ï‚· Street names and addresses.
FOR GROUND-MOUNTED SOLAR ARRAYS, THE FOLLOWING:
ï‚· Property lines with dimensions.
ï‚· All sidewalks, driveways, curbs and gutter, and parking areas.
ï‚· All existing easements, rights-of-way, and any other restrictions on the use of the
property.
ï‚· Existing buildings, proposed buildings, and other significant features on the site.
ï‚· Existing buildings and significant features located on adjacent properties within 50 feet
(50’) of the subject property boundaries.
ï‚· When required by the City Planner or City Engineer, and for all new construction, a
survey including both existing and proposed contours of the land at intervals of two
feet (2’) or better. "
- SLD Reqs
The customer is required to provide and install meter bases in-line between the inverter disconnect switch and the customer's service entrance cable. BCL&P will provide the meters and will monitor the total electrical generation of the photovoltaic system. The location of the meter bases for the Feed In Tariff Production Meters must be approved by BCL&P prior to construction.
"Please see Application Packet for sample Upon approval of the block diagram, Power will
stamp the diagram. Please include the stamped diagram with your solar application."
- Install Reqs
The customer is required to furnish and install the photovoltaic meter base and the photovoltaic disconnect switch, in addition to the electric service meter, according to all applicable codes. The customer is required to keep the area in front of and immediately around the meters and the disconnect switch clear and accessible to allow maintenance and reading of the meters.
- Equipment Approvals
- California Energy Commission
- Label Page Notes
Reference Utah Labels block
- Website
- link
Other details
- Restrict Inspection
- 0
- Address ID
- 644765
- Express Planset Eligible
- Yes