City of Ephraim

Utah Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the electricity generated by the Customer’s System exceeds the Customer’s consumption, and the Customer’s excess electricity is distributed back to the City during the billing period, then the Customer shall still be billed for the customer service charge(s) paid by other customers of the City in the same rate class as Customer, however, Customer shall be credited for the net excess kilowatt-hours generated during the billing period at a wholesale rate set forth in the City’s fee schedule, which may be amended from time to time at the sole discretion of the City. Any credit earned by the Customer shall appear on Customer’s bill for the following billing period. On April 30th of each calendar year, any remaining unused kilowatt-hour credit accumulated during the previous year shall be granted to the City without any compensation to Customer.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
5
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Maximum 5 kW for residential; 15 kW for commercial

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Equipment Approvals
California Energy Commission
Website
link
Phone
(435) 283-4631

Other details

Restrict Inspection
0
Address ID
1022013
Express Planset Eligible
Yes