Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Hurricane (UT)

Utah Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.04
Net Excess Generation Notes

Hurricane City Power will purchase any energy the customer delivered to the City’s power grid during that billing cycle. The rate at which Hurricane will purchase the energy is $0.04/kwh and is part of the Hurricane City Power Rate Schedule.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Recommended max: 8.1 kW DC / 6 kW AC


Installations of up to 16 KW DC /12 KW of AC output with a 6 KW limiter will be considered by Hurricane City Power Staff on a case-by-case basis. Installations with battery storage are allowed without size limitation. An installation with battery storage shall not export more than 6 KW. $0.00 export rate for battery projects


System over 8.1 kW DC/6 kW AC will require additional Interconnection study, cost will vary depending on the size, customer location, transformer/pole existing load and etc.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link

Other details

Restrict Inspection
0
Revision Required
1
Address ID
1175146
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Hurricane (UT) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.