City of Hurricane (UT)

Utah Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.04
Net Excess Generation Notes

Hurricane City Power will purchase any energy the customer delivered to the City’s power grid during that billing cycle. The rate at which Hurricane will purchase the energy is $0.04/kwh and is part of the Hurricane City Power Rate Schedule.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Recommended max: 8.1 kW DC / 6 kW AC


Installations of up to 16 KW DC /12 KW of AC output with a 6 KW limiter will be considered by Hurricane City Power Staff on a case-by-case basis. Installations with battery storage are allowed without size limitation. An installation with battery storage shall not export more than 6 KW. $0.00 export rate for battery projects


System over 8.1 kW DC/6 kW AC will require additional Interconnection study, cost will vary depending on the size, customer location, transformer/pole existing load and etc.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link

Other details

Revision Required
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Hurricane (UT) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.